1. Before work begins
Identify the owner, developer, contractor and other parties involved. The contract and financing requirements help establish who is expected to arrange particular insurance and what evidence is needed.
Separate the existing building from the new work, and identify project values, scope and dates. A renovation, new build and installation project can require different information. Insurance should be considered before work starts; a later inquiry cannot be assumed to protect earlier work.
2. Protect the operating business
The contractor's ongoing business has interests beyond any single job. Business Liability Insurance addresses specified claims of injury or damage arising from insured operations. Tools, mobile machinery and hired equipment have their own property interests across sites, storage and transit.
Design or construction-management responsibilities can raise professional-liability questions. Pollution exposures require separate attention. These subjects should be considered against the work actually performed, including subcontracted activities.
3. Protect the project underway
Builders risk, also called course of construction, concerns insured damage to project property. Wrap-up liability concerns defined project-related liability and participants. Construction Project Insurance explains their different roles.
Changes to budget, scope, materials, schedule, storage or site protection can affect the information provided. Delays may create financing costs and lost income without automatically producing an insured claim. Any relevant financial protection needs to be established in the terms purchased.
4. Connect completion and occupancy
Early occupancy, phased handover, work stoppages and completion can affect when different arrangements apply. Coordinate the end of project protection with the owner's ongoing property insurance. The contractor's continuing responsibilities and any defined completed-operations period also need attention.
Surety Bonds address specified contractual obligations. They perform a different role from insurance for damaged work or liability allegations.
Explore your work
Find General Contractor Insurance, Home Builder & Renovation Contractor Insurance, Trade Contractor Insurance, Developer Insurance and Restoration & Remediation Contractor Insurance.
Illustrative situation: a developer opens part of a building while construction continues elsewhere. Describe the occupied and unfinished portions before assuming one policy addresses both stages.
What to have ready
Bring the parties and contracts, project and existing-property values, scope, dates, site protection and planned occupancy. The Resource Toolkit provides preparation guidance; Working with New World Agency explains the brokerage process.
Information that changes the picture
Describe work at occupied premises, hot work, excavation, work below grade and any design responsibility. Project scope, values, duration, construction methods, existing property and fire or water protection help explain the risk. Terms can also be influenced by experience, subcontractor controls, loss history, deductibles and limits.
A useful distinction before quoting
The contractor's annual operating policy and a project's builders risk or wrap-up arrangement have different purposes. Identify who is arranging each part and which parties and activities it accepts. Share the contract before assuming a certificate proves that every requirement has been met.
A closer look
Put the details in context.
Illustrative situations showing what to review when the picture changes.
A contract divides the responsibilities
Identify who is arranging project property, project liability and any required bonds. Builders risk, wrap-up liability and surety address different interests, even when the same contract refers to all three.
Construction ProjectWork moves toward occupancy
Testing, phased handover and early occupation can change the insurance picture before the final work is complete. Share the planned sequence and review the transition to ongoing property insurance.
Commercial Property & EquipmentBring the picture together
Prepare for a useful conversation.
Fillable PDF · 1 page
Construction project preparation
Organize project scope, timing, parties, site conditions and insurance questions.
Open fillable PDF: Construction project preparation (opens in a new tab)A clearer view
Questions worth asking.
Is the contractor's annual insurance the same as builders risk?
No. They address different interests. Identify the contractor's ongoing protection, the project arrangements and who is responsible for arranging each.
When should we send contract insurance requirements?
Send them before committing to an arrangement or starting work where possible. A certificate does not alter the actual policy or prove that every contractual requirement is insured.
Your world, explained
Guidance you can use.
Your next step
Bring your application into view.
Complete the relevant New World application, save a draft and add supporting documents before sending it for review.
Construction
Construction projects & development
Project property, wrap-up and existing-building details in one coordinated application.
Save a draft · Add documents · Review before sending
Start application: Construction projects & development (opens in a new tab)Construction
Contractors, trades & equipment
Operations and specialist work, with equipment and subcontracting details.
Save a draft · Add documents · Review before sending
Start application: Contractors, trades & equipment (opens in a new tab)